Neasden SCC

We were asked to install six units on a plateau 20m above ground level over an operational underground railway line. Health and Safety considerations were obviously paramount in the successful installation of these units.

The operation was carried out on a Sunday with full site management in order to minimise disruption to maintenance works. Part of the successful delivery included: advising the Cleint of the size of units and the type of base required, desinging and building all steel stairways and walkways, arrangeing all line closures, supplying SPIC's and other personnel.

A 180tonne crane was used to position the units and temporary line closures were in place during the lifting operation.

Case Studies

Over the years we have carried out many complex installations in live railway environments. Have a look at some of the projects carried out

Installation of 3 units inside a building via shop entrance

Need to install units under power line cables? Ring Advante!

Delivery on a plateau 20m above ground level over an operational railway line - all in a day's work!

Need lifting over an exisitng building? No problem!

More Case Studies